- You are here: Homepage »
TAKE A NOTE | 2026 Slim Biweek Planner - [Eng.]
- Price
- 26,50 €
TAKE A NOTE IS HERE!
Some people need detailed time management, while others prefer a simple and clear structure.
The SLIM BIWEEK Planner was designed for the latter.
Carrying forward TAKE A NOTE’s minimalist design philosophy, the SLIM series features a narrow, lightweight format. It can be used on its own or inserted into a Traveler’s Notebook (TN), making it highly versatile and compatible with various covers and accessories.
Content:
● Opening Page
● Yearly Calendar【Jan 2026 – Dec 2026】 (1P)
● Horizontal Yearly Gantt Plan 【Jan 2026 – Dec 2026】 (1P)
● Vertical Yearly / Project Plan 【Jan 2026 – Dec 2026】 (4P)
● Monthly Plan 【Dec 2025 – Mar 2027】 (32P)
● Weekly Plan 【Jan 2026 – Dec 2026】 (54P)
● Functional Grid Note Pages (18P)
● Personal Info
Details:
- Size: 11 × 21 cm (TN size)
- Paper: 52gsm Tomoe River S Paper / White
- Pages: 112
- Binding: Exposed spine thread binding, lays flat at 180°
- 4mm grid with lighter 2mm sub-grid for a cleaner look
- Size
- Weeks
- Availability
- Temporarily out of stock
Subscribe to the availability notification
If the product or model you have been looking for is out of stock, subscribe to availability notification.
